Iraq Mobese and Control Center Image 1

Iraq Mobese and Control Center

Iraq Mobese and Control Center Image 1
Iraq Mobese and Control Center Image 2
Iraq Mobese and Control Center Image 3
Iraq Mobese and Control Center Image 4
Iraq Mobese and Control Center Image 5
Iraq Mobese and Control Center Image 6
Iraq Mobese and Control Center Image 1
Iraq Mobese and Control Center Image 2
Iraq Mobese and Control Center Image 3
Iraq Mobese and Control Center Image 4
Iraq Mobese and Control Center Image 5
Iraq Mobese and Control Center Image 6

Iraq Mobese and Control Center

Located in Suleiman, Iraq, the Mobese and Control Center project was completed in 2020. The project included design management, project management, and project design processes, as well as seismic raised floor design and project management for the CCTV Center. 'DOF ALL IN ONE' systems were successfully implemented for the data center and CCTV-Control Center.

Teknik Özellikler

Project Location
Suleiman / Iraq
Project Year
2020

Proje Kapsamı

01

Design Management

02

Project Management

03

Project Design

04

CCTV Center Seismic Raised Floor Design and Project Management

05

'DOF ALL IN ONE' Systems Were Carried Out for the Data Center and CCTV-Control Center